Telecommunications Equipment Contractor
- Central Office
- Outside Plant
dc Power Contractor
- 24v, 48v, 130v, 256v, 480v
- Battery, Rectifiers, Distribution
- Solar
- Installation
- Removals
- Engineering
- Power Audits
- Scheduled Maintenance
- Testing
- Recycling
- Warehousing & Transportation
|
|
|
 |
|
|
 |
 |
|
REMOVAL & INSTALL We remove, and rearrange all Telecommunications and dc Power Equipment in Central Offices, Outside Plant, Cellular, Utility and UPS environments including batteries, cabling, ironwork, power & ringing plants and distribution. Our Installation Services include dc power equipment, distribution, ironwork and batteries, spill containment systems as well as al types of telecommunications.
We currently employ Index 5 installers in California, Hawaii and Nevada. |
|
|
Engineering
Our design, sizing and engineering department is qualified to handle virtually any size project from $5k to $50M; 24v cell site to a 130v utility power plant or a 480v UPS financial facility
Engineering services include:
- battery system sizing
- design & layout
- equipment & material detail
- cable structures
- seismic support
As Built, changes, additions and removal CAD drawings are available in all sizes.
|
|
 |
 |
|
Scheduled Maintenance
Scheduled maintenance contracts are intended to get the maximum performance and extended life from your battery. Depending on battery type, size, and application, we’ll recommend either a quarterly, semi annual or annual maintenance visit where we will perform visual inspections, electronic testing, general clea nup, and provide written reports that will provide baseline data for warranty and timely budget planning.
|
|
Experienced DC Power professionals
The owner and employees of Skyler Electric have been provisioning dc Power for over 20 years. Staffed with sales, engineering, installation, quality assurance, and project management professionals, there is no better choice for dc power provisioning than Skyler Electric Company.
Our lead, Index 5 installers have spent a minimum of 6 years in training and have the experience and knowledge to manage all aspects of power provisioning including grounding. We have provisioned complete dc power systems for 24 volt cellular, 48 voltcentral office up to 10,000 Amps, 130v utility switch-gear, and up to 540v UPS data centers including Zone 4 structural support, copper buss network termination, power distribution, BDFB’s and power boards.
|
|
|
 |
 |
|
* Warehousing & Transportation
|
 |
|
Capacity and Acceptance Testing
Telecommunications, power utilities, data and financial, health care and aviation depend on reliable backup. Whether you need acceptance testing on new batteries or you want to know the reliability of an aging system, load testing is the only reliable method. Our state of the art equipment tests any size string up to 256 cells by performing constant current capacity and power capacity tests, and supports UPS testing using AC load banks, and supports run-down testing using system load.
|
 |
|
Spent Battery Recycling
Skyler Electric Company is passionate about responsible recycling of spent batteries. We recycle hundreds of thousand of pounds of spent batteries each year with The Doe Run Company in Boss, MO. Doe Run operate one of the world’s largest recycling lead smelters. Trust that your spent batteries will be properly recycled and if needed, we’ll provide you with a Certificate of Recycling.  |
|